LRL Ltd carried out the full removal of existing roof build up to a functioning Bupa care home.

A Bauder Total Roof System was installed with a full thermal upgrade. This was a challenging project as the roof area had been neglected for some time, however once the existing substrate had been fully removed the remarkable change around commenced.

New hatch doors were installed and painted bringing what was a very poor flat roof area back to life.

Once again the LRL ltd team caused no disturbances throughout the project, on what was a highly sensitive care home.